# KOSGEB Green Industry Support Program Consulting

KOSGEB Green Industry: up to 7 million TL of 70% repayable support for manufacturing SMEs. Eligibility check, support calculator and application consulting.

Are you a small or medium-sized manufacturer? For projects on energy, water and raw material efficiency, waste recycling, industrial symbiosis and the circular economy, KOSGEB provides repayable support of up to 7 million TL at a 70% rate; if installments are paid on time, there is no interest or commission. Let's clarify your eligibility and your project idea together.

**Preliminary applications close in:** Last day: 9 December 2026, 23:59 (Türkiye time) 31 January 2027 is not the preliminary application deadline; it is the project application deadline, only for businesses that pass the first stage.

Since 2007 · 1000+ companies · 9 service areas · Independent consultancy, not a public institution

## The program in numbers

- **7 million TL**: Support ceiling per project. The support is repayable.
- **70%**: Support rate. The business covers the remaining 30% of the budget.
- **12 months**: Project duration: 3 monitoring periods of 4 months each. Projects start on 1 April 2027.
- **12 months**: Grace period after the project ends; followed by 4 equal installments every three months.
- **3 billion TL**: Estimated budget of the call. Around 1,000 businesses are expected to be supported.

This program is not a grant: the support is repaid after the project ends. If installments are paid on time, no interest or commission is applied (Directive, Art. 26/3). At the payment stage, a letter of guarantee or a KGF surety letter for the amount of the support is required.

Additional points are given to businesses whose owner, or a partner holding 51% or more of the shares, is a woman; businesses submitting a valid TSE K 645 Women Entrepreneur Certificate benefit from an additional quota.

## Who can apply? Check these eight conditions first.

- **Sector:** You operate in Section C, manufacturing, under the NACE Rev. 2.1 classification.
- **Scale:** You are a small or medium-sized business. _Micro businesses cannot submit a preliminary application._
- **Age:** Your business was established at least 2 years before the call announcement date.
- **KOSGEB registration:** You are registered in the KOSGEB Database; your Business Declaration is approved and up to date.
- **Bookkeeping:** You kept books on a balance sheet basis in the last approved financial year.
- **Industrial Registry:** You hold a current Industrial Registry Certificate on the preliminary application date.
- **Findeks:** Your credit score is in the "medium risk" group or better (low risk, good, very good).
- **Budget:** The project budget is at least 1,000,000 TL. _The balance sheet or net sales of your last financial year must exceed the project budget._

**Additional note:** The main activity code must not be among the sectors and activities ineligible for World Bank financing, and the business must be at a "low" or "medium" level under the monitoring criteria of the Environmental and Social Management System. A business can benefit from these calls only once.

**If you are not eligible:** Telling you "you are not eligible for this program" is also part of our job. We look together at whether another support in our 9 service areas fits you.

## One-minute eligibility check

Seven questions, one click each. Your sector, scale and age answers are filled into the form automatically.

- Is your business in manufacturing (NACE Rev. 2.1, Section C)? Yes, manufacturing · No, another sector
- What is the size of your business? Micro (fewer than 10 people) · Small (10-49 people) · Medium (50-249 people) · Large (250 people or more)
- Was your business established at least 2 years ago? Yes, 2 years or older · No, younger than 2 years
- Do you have a current Industrial Registry Certificate? Yes, current · Yes, but not current · No
- Did you keep books on a balance sheet basis in the last financial year? Yes · No, operating account basis · Not sure
- Which group is your Findeks credit score in? Medium risk or better · A riskier group · I don't know
- Is your project budget at least 1,000,000 TL, and are your last-year balance sheet or net sales larger than this budget? Yes, both · No · Not decided yet

This check is for preliminary information only; the final assessment is made with documents.

## How much support could you get, and when would you repay it?

Enter your planned project budget to see the support amount, your own contribution and the repayment schedule.

### Repayment schedule (estimate)

- **Project period** 1 April 2027 – 31 March 2028: 3 monitoring periods of 4 months; support is paid at the end of each period for expenses found eligible.
- **Grace period** April 2028 – March 2029: No repayment for 12 months.

If installments are paid on time, no interest or commission is applied (Directive, Art. 26/3).

_This is an estimate. The final support amount is set by the KOSGEB board decision, based on the expenses found eligible; dates become final with the project start and the board decision. Amounts exclude VAT._

## Which projects are supported?

The six project topics of the call. Your project may touch more than one.

- **Energy efficiency**: Projects that cut energy use per unit of product: waste heat recovery, efficient motors, pumps and compressors, energy monitoring systems.
- **Water efficiency**: Projects that reduce water use in the process, or recover and reuse water.
- **Raw material efficiency**: Projects that reduce scrap and rejects, producing the same product with less raw material.
- **Waste recycling**: Sustainable and climate-resilient waste recycling: separating production waste and putting it back to use.
- **Industrial symbiosis**: One business's waste or by-product becoming another business's input.
- **Circular economy**: Design and production models that extend product life; reusable, repairable or recyclable products.

The examples are only to give you an idea; the KOSGEB board decides whether a project is eligible.

## Which expenses are supported?

| Expense | Scope |
| --- | --- |
| Personnel | Up to 2 new full-time employees linked to the project. Monthly ceiling per person is 2 times the gross minimum wage; calculated on the net wage. |
| Machinery and equipment | Must be new. IT hardware and non-consumable hardware components are included. |
| Software | Licence or cloud use (including licences limited to the project period); software-related training and consulting. |
| Service procurement | Training, testing and analysis, certification and consulting expenses. |

Expenses are supported excluding VAT. Real estate purchase, building construction, furnishing, vehicle purchase and rental, personnel not linked to the project, taxes, fees and social security premiums are not supported.

## Call timeline

Official dates from the preliminary application to the project start.

- **16 November 2026**: Preliminary application opened (Through the KOSGEB system (login with e-Devlet).)
- **9 December 2026, 23:59**: Preliminary application closes (Preliminary applications not confirmed in the system by this time are not evaluated.)
- **18 December 2026**: First stage results (Scored by financial indicators; twice as many businesses as the planned number pass.)
- **21 December 2026 – 31 January 2027**: Project application (Only for businesses that pass the first stage. The 2025 carbon emission report is attached at this stage.)
- **31 March 2027**: Supported businesses announced (Board evaluations are completed by 24 March 2027 at the latest.)
- **1 April 2027**: Projects start (12 months; 3 monitoring periods of 4 months each.)

## What do we do?

The same team from the preliminary application to the last payment request.

1. **Preliminary application**: We check the eight conditions against your documents and complete your preliminary application in the system with you, without waiting for the last day. If you are not eligible, we say so clearly. What we ask from you: KOSGEB registration, Industrial Registry Certificate, last year's balance sheet.
2. **Carbon emission report**: We plan the process so that you obtain the 2025 Scope 1, 2 and 3 report on time from organizations validated by TSE, and coordinate the correspondence with the organization. The organization prepares the report. What we ask from you: Energy, fuel, water and raw material consumption data.
3. **Project application**: If you pass the first stage, we prepare the project information document, the budget and the annexes (CPA or independent auditor form, Findeks report, World Bank environmental and social form) before 31 January. What we ask from you: Quotes, machinery and software lists, staffing plan.
4. **Monitoring and payment requests**: Over the 3 monitoring periods of 4 months, we follow the expense documents and payment requests, the guarantee process and the post-project reports (2027 emission report: by 30 November 2028). What we ask from you: A steady flow of documents during the project.

## Why Arslanlı?

- **Since 2007**: Grant, incentive and investment consulting.
- **With 1000+ companies**: Projects carried out.
- **9 service areas**: Alongside KOSGEB: TÜBİTAK, Ministry of Industry and Technology, Ministry of Trade support, EU projects, investment loans, investment consulting, industrial property and quality certification. You see the supports that can be combined in a single plan.
- **The same team from application to closing**: The team that writes the file also runs the monitoring periods and payment requests.
- **Accurate information**: We never say "7 million TL grant". We tell you from the start that the support is repayable and under which conditions it stays interest-free.

## Frequently asked questions

### Is the Green Industry support a grant?

No. The support is repayable: after the project ends there is a 12-month grace period, then it is repaid in 4 equal installments every three months. "7 million TL" is not a grant amount but the support ceiling.

### When is the application deadline?

The preliminary application closes on 9 December 2026 at 23:59:59; preliminary applications not confirmed in the system by then are not evaluated. 31 January 2027 is the project application deadline, only for businesses that pass the first stage, not the preliminary application deadline.

### Will I pay interest?

If installments are paid on time, no interest or commission is applied (Directive, Art. 26/3). If an installment is not paid when due, the process in the directive applies and statutory interest may be charged.

### Is a guarantee required?

Yes. At the support payment stage, a letter of guarantee or a Credit Guarantee Fund (KGF) surety letter for the amount of the support is submitted.

### What is the carbon emission report and where do I get it?

A 2025 Scope 1, 2 and 3 carbon emission measurement report is attached to the project application. It is obtained from organizations holding TSE's Greenhouse Gas Calculation Tool Validation Certificate. After the project, the 2027 report must also be submitted by 30 November 2028; otherwise the remaining installments are collected in a single payment.

### When is the support paid?

The project is monitored over 3 periods of 4 months; at the end of each period, payment is requested for the expenses found eligible. Early payment of up to 50% of the support in the board decision may also be made, subject to the program budget.

### I am a micro business, or my business is less than 2 years old. Can I apply?

You cannot apply to this call; it is open to small and medium-sized manufacturers that are at least 2 years old. We can look together at whether another support fits you.

### Is there an advantage for women entrepreneurs?

Yes. Additional points are given if the business owner, or a partner holding 51% or more of the shares, is a woman, or if 51% of the managers and authorized representatives are women. Businesses that submit a valid TSE K 645 Women Entrepreneur Certificate and pass the evaluation stages are supported under an additional quota.

### Do you provide the support?

No. Arslanlı Consulting is an independent consulting firm; it is not a public institution. The support decision belongs to the KOSGEB board.

### Do you promise approval?

No. In the first stage, applications are scored and ranked by financial indicators, and then the board evaluates them. Our job is to prepare your file completely and strongly.

## Request an assessment

Leave your details; we will call you and clarify your eligibility and the preliminary application steps together before 9 December. [Request an assessment](https://arslanlidanismanlik.com/en/kosgeb/green-industry#on-degerlendirme)

[KOSGEB Support](https://arslanlidanismanlik.com/en/services/kosgeb-support.md)

The information is based on the KOSGEB Green Industry Support Program 2026-01 "Clean and Circular Economy in Industry" Project Proposal Call and the Green Industry Support Program Directive (16.11.2026); conditions may change. Refer to KOSGEB's official announcements for current conditions. Arslanlı Yatırım & Danışmanlık is an independent consulting firm; it has no organic link with KOSGEB or any public institution and does not provide the support.

Arslanlı Consulting is an independent consulting firm; it is not a public institution.

## Contact

- Phone: +90 501 699 42 77, +90 501 678 42 77
- Email: info@arslanlidanismanlik.com
- Address: Starport Residence, Yenişehir Mah. Millet Cad. Sümbül Sk. No:10 D:28, 34912 Pendik / İstanbul
- Contact page: https://arslanlidanismanlik.com/en/contact